Q-2, r. 28.2 - Snow, road salt and abrasives management Regulation

Full text
8. A storage and handling centre for road salt and abrasives must be sited
(1)  60 m or more from a watercourse or lake and 30 m or more from wetlands;
(2)  outside a flood zone;
(3)  15 m or more from a septic tank other than a septic tank located on the site;
(4)  30 m or more from all vegetation used as a wind or noise shield; and
(5)  100 m or more from a category 1, 2 or 3 groundwater withdrawal site.
O.C. 871-2020, s. 8; I.N. 2021-06-15.
8. A storage and handling centre for road salt and abrasives must be sited
(1)  60 m or more from a watercourse or lake and 30 m or more from wetlands;
(2)  outside a floodplain;
(3)  15 m or more from a septic tank other than a septic tank located on the site;
(4)  30 m or more from all vegetation used as a wind or noise shield; and
(5)  100 m or more from a category 1, 2 or 3 groundwater withdrawal site.
O.C. 871-2020, s. 8; I.N. 2021-06-15.
8. A storage and handling centre for road salt and abrasives must be sited
(1)  60 m or more from a watercourse or lake and 30 m or more from wetlands;
(2)  outside a floodplain;
(3)  15 m or more from a septic tank other than a septic tank located on the site;
(4)  30 m from all vegetation used as a wind or noise shield; and
(5)  100 m or more from a category 1, 2 or 3 groundwater withdrawal site.
O.C. 871-2020, s. 8.
In force: 2020-12-31
8. A storage and handling centre for road salt and abrasives must be sited
(1)  60 m or more from a watercourse or lake and 30 m or more from wetlands;
(2)  outside a floodplain;
(3)  15 m or more from a septic tank other than a septic tank located on the site;
(4)  30 m from all vegetation used as a wind or noise shield; and
(5)  100 m or more from a category 1, 2 or 3 groundwater withdrawal site.
O.C. 871-2020, s. 8.